Setting up home after moving to Monaco – SMEG, water, Monaco Telecom, TV, insurance and waste
Last updated 25 September 2026Rules checked every MondayOfficial sourcesSources & methodology →
Your residence-card application needs an electricity contract, so the utilities come before the paperwork when moving to Monaco. Here is how to open electricity, gas, water, internet and mobile, what is compulsory in insurance, and how the bins work.

If you are moving to Monaco, one document sets the order of your first week. The Sûreté Publique asks every residence-card applicant for an electricity contract or the latest electricity bill, so the contract with SMEG, the Société Monégasque de l'Electricité et du Gaz, comes before the residence file. SMEG's tariffs were updated on 1 August 2026, Monaco Telecom's fibre prices apply from 3 November 2025 and its mobile prices from 14 September 2026.
Moving to Monaco: the utilities at a glance
| Service | Who | What to bring | Where |
|---|---|---|---|
| Electricity and gas | SMEG | ID, IBAN, lease or title deed with floor and flat number, the previous occupant's name, the power wanted, a start date | La Boutique by SMEG, 11 allée Guillaume Apollinaire, Monday–Thursday 9:00–17:00, Friday 10:00–17:00, (+377) 92 05 66 44 |
| Water | Société Monégasque des Eaux (SMEaux) | Lease or proof of ownership, ID, IBAN, phone and email, start date | 29 avenue Princesse Grace, Monday–Friday 8:00–12:00 and 13:00–17:00; subscriptions +377 93 30 94 48 |
| Internet, mobile, TV | Monaco Telecom | IBAN, ID, proof of residence, full address with the five-character code on the square logo above your front door | Shops at 9 rue du Gabian and 27 boulevard des Moulins; customer service 99 66 33 00 |
| Waste | Société Monégasque d'Assainissement (SMA) | Nothing – collection is free | Sorting hotline 8000 20 40; bulky waste (+377) 92 05 75 16 |
Source: SMEG, Société Monégasque des Eaux, Monaco Telecom, SMA and MonServicePublic, read 24 September 2026.
Electricity and gas with SMEG – contract, billing and the 1 August 2026 tariffs
You must take a contract in your own name even if the power is already on, and SMEG recommends applying before you move in; supply starts a few working days after the file is approved. A home without power for three months or more needs a certificate that the safety checks have been done, and a new or renovated installation a conformity certificate from an approved inspection body.
Homes are on the Tarif GO, for 3 to 36 kVA, and all the electricity SMEG supplies is green and renewable. The price depends on the subscribed power and on the option: 'base', one price per kWh around the clock, or peak and off-peak, with a cheaper kWh for eight hours a night. Tariffs are approved by the government and the current ones date from 1 August 2026; SMEG publishes the prices only in a brochure, not reproduced here.
| Term | What applies |
|---|---|
| Contract length | One year, renewed by tacit renewal; the subscribed power can be changed once a year, on the anniversary date |
| Billing and payment | After each meter reading, by default every 3 months; pay within 15 days, or supply can be cut 10 days after a formal notice by registered letter |
| Cancelling | At any time, in writing, effective within 30 days; within the first 12 months you still owe the fixed charge to the anniversary date |
| Gas bands | By annual use: Base under 1,000 kWh (cooking); B0 1,000–7,000 kWh; B1 7,000–30,000 kWh (heating); B2I 30,000–150,000 kWh; winter prices 1 November to 31 March |
| Emergencies and gas smells | (+377) 92 05 05 05, around the clock |
Source: SMEG (FAQ, Tarif GO, Tarifs Gaz and the general terms for the Tarif GO), read 24 September 2026.
Water from SMEaux – €4.28 a cubic metre
From 1 July to 31 December 2026 an individual customer pays €4.28 including VAT per cubic metre, covering the drinking water and its treatment after use, plus a subscription that depends on the diameter of the connection and meter. According to SMEaux, a typical household uses about 110 cubic metres a year. Once the contract is signed, MonServicePublic says, the water is turned on within 24 hours of the appointment. The round-the-clock emergency line is (+377) 93 30 39 36.
Internet, mobile and TV with Monaco Telecom
As a resident you sign up with a valid residence card at the new address plus the flat's 'logo' number; until the card arrives, non-residents subscribe with ID and proof of address under three months old. Home fibre prices have applied since 3 November 2025.
| Fibre plan | Speed | First 12 months | Then |
|---|---|---|---|
| BASIC | 500 Mb/s | €34.99 a month | €39.99 |
| COMFORT | 2 Gb/s | €39.99 | €59.99 |
| COMFORT+ | 5 Gb/s | €49.99 | €69.99 |
| PREMIUM | 10 Gb/s | €59.99 | €99.99 |
| PLATINUM | 10/10 Gb/s | €199.99 | €199.99 |
Source: Monaco Telecom, price sheet for La Fibre, read 24 September 2026.
Prices include VAT. Return the box when the contract ends, or Monaco Telecom charges €250. Monegasques, 'enfants du pays', spouses of Monegasques and protected tenants under Law 1.235 get €5 to €40 a month off.
Mobile plans, priced from 14 September 2026, are only for private customers who live in Monaco or can show a stable link to it, such as a job or a bank account there, and carry a €9.99 activation fee. With a 24-month commitment and no handset, Live-Essential costs €25.99 a month, Live-Mini €36.99, Live-Connected €49.99 and Live-Traveller €109.99; fibre customers pay less, from €7.99. The catalogues list no prepaid offer. Since 5 March 2024, phones on French contracts have roamed on Monaco Telecom's network; dial +33 to call France. TV is simple: the cable network carries a free digital service of about 80 channels, and no licence fee is mentioned on the official pages read.
Home insurance – what is compulsory in Monaco
According to MonServicePublic, insurance in Monaco rests mainly on French provisions, and some cover is compulsory for individuals, motor insurance for example. For your home it depends on the sector: tenants of State-owned (domanial) flats must hold a 'multirisques habitation' policy with an insurer approved in Monaco, and in the protected sector Law 1.235 lets a lease end automatically if the tenant fails to insure the rental risks. In the free sector, where newcomers rent, the official texts read set no general obligation – your lease decides, so read its insurance clause before you sign.
Waste and noise
Collection by the SMA is free. Since 2019 all household packaging – plastic, metal, cardboard – and paper go in the yellow bin; glass goes only in the green containers, never in the yellow bin. About fifty drop-off points take both, the YourMonaco app maps them, and a badge for the public waste rooms comes from the DAU on (+377) 98 98 77 22 or from the SMA.
| Waste | Where | Rule |
|---|---|---|
| Household waste | Wheeled bins, or the pneumatic system where the building is connected | Non-recyclables in closed bags; bins may not stand on the public road outside collection times (Ministerial Order 2017-38) |
| Recyclables | Yellow bin, loose | A mis-sorted bin is not collected; nobody may rummage through the bins |
| Bulky items | SMA, households only, by appointment | Free, 1 m³ per appointment, out on the day before 9:00; burnable items can go to the waste-to-energy plant on boulevard Charles III at no charge |
| Paint, solvents, batteries | 3 rue du Gabian, Fontvieille | Monday–Friday 9:00–12:00 and 13:15–17:00, Saturday 8:45–12:00 |
Source: MonServicePublic, SMA and Ministerial Order 2017-38 (Legimonaco), read 24 September 2026.
Noise is regulated: Sovereign Ordinance 10.885 of 1993 caps neighbourhood noise at 5 dBA above the background level by day (7:00–22:00) and 3 dBA at night, Ministerial Order 2018-1116 limits building sites to Monday–Friday 7:30–19:30, and Ministerial Order 2021-107 sets an alert threshold of 85 dB(A) that no site may exceed. If a neighbour is noisy, MonServicePublic says to tell the building manager or owner first, then call the police so they can record it on the spot.
What to do now
| Step | What | When |
|---|---|---|
| 1 | Book van parking with the Mairie (Police Municipale, (+377) 93 15 28 26); the permit carries a fee | At least 5 working days before moving day |
| 2 | Open the SMEG contract in your own name, and send the SMEaux form | Before you move in |
| 3 | Subscribe to Monaco Telecom with the logo number and, once issued, your residence card | Moving week |
| 4 | Keep the SMEG contract or first bill for the residence-card file | Within 8 days of arrival |
| 5 | Report any later change of address to the Section des Résidents – a new card costs €30 | Within 8 days of moving |
Source: MonServicePublic and Mairie de Monaco, read 24 September 2026.
Official sources
The official pages this guide is based on, read 24 September 2026. Links open the authority’s own website.
- SMEG – FAQ · smeg.mc
- SMEG – Conditions générales de vente Tarif GO, art. 4 · smeg.mc
- SMEG – Tarif GO page · smeg.mc
- SMEG – FAQ; Tarifs électricité page · smeg.mc
- SMEG – Tarifs Gaz · smeg.mc
- SMEG – Aide et contact · smeg.mc
- Société Monégasque des Eaux – Informations utiles · smeaux.mc
- Société Monégasque des Eaux – Fiche de souscription d'un abonnement (PDF) · smeaux.mc
- Société Monégasque des Eaux – home page and Distribution d'eau potable · smeaux.mc
- Monaco Telecom – Fiche descriptive La Fibre (PDF) · monaco-telecom.mc
- Monaco Telecom – Fiche descriptive Forfaits mobiles (PDF) · monaco-telecom.mc
- Monaco Telecom – Assistance administratif · monaco-telecom.mc
- MonServicePublic – FAQ Réseau mobile unifié (itinérance) · monservicepublic.gouv.mc
- Monaco Telecom – Assistance Service Universel de Télévision · monaco-telecom.mc
- MonServicePublic – Déclarer un sinistre dans un appartement domanial · monservicepublic.gouv.mc
- Legimonaco – Loi n° 1.235 du 28 décembre 2000 (consolidated) · legimonaco.mc
- MonServicePublic – Collecte des déchets · monservicepublic.gouv.mc
- SMA – Déchets recyclables · sma.mc
- SMA – Encombrants publics; MonServicePublic – Collecte des déchets · sma.mc
- Legimonaco – Arrêté ministériel n° 2017-38 du 20 janvier 2017 · legimonaco.mc
- Legimonaco – Loi n° 834 du 8 décembre 1967 · legimonaco.mc
- Legimonaco – Ordonnance souveraine n° 10.885 du 12 mai 1993 · legimonaco.mc
- MonServicePublic – Nuisances sonores · monservicepublic.gouv.mc
- Legimonaco – Arrêté ministériel n° 2018-1116 du 3 décembre 2018 relatif à l'encadrement des chantiers (consolidated) · legimonaco.mc
- Legimonaco – Arrêté ministériel n° 2021-107 du 2 février 2021 relatif aux bruits de chantiers · legimonaco.mc
- MonServicePublic – Demander une autorisation de construire et/ou de démolir ou un accord préalable · monservicepublic.gouv.mc
Relocate in Europe provides general information, not legal or financial advice for your individual situation. Check with the authority named above before you act – rules change, and your case may differ.